EFFICIENCY OF CMMS (COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM) PROJECT STAGES WITH K-MEANS
Abstract
Full Text:
PDFArticle Metrics :
References
H. Mohd Noor, S. A. Mazlan, and A. Amrin, “Computerized Maintenance Management System in IR4.0 Adaptation - A State of Im-plementation Review and Perspective,” IOP Conf Ser Mater Sci Eng, vol. 1051, no. 1, p. 012019, Feb. 2021, doi: 10.1088/1757-899X/1051/1/012019.
A. J. J. Braaksma, W. Klingenberg, and J. Veldman, “Failure mode and effect analysis in asset maintenance: a multiple case study in the process industry,” Int J Prod Res, vol. 51, no. 4, pp. 1055–1071, Feb. 2013, doi: 10.1080/00207543.2012.674648.
S. M. Arachchi, S. C. Chong, and A. Kathabi, “System Implementation Failures in the ERP Development Process,” Journal of Com-puter and Communications, vol. 07, no. 12, pp. 112–127, 2019, doi: 10.4236/jcc.2019.712011.
F. Beniacoub, F. Ntwari, J.-P. Niyonkuru, M. Nyssen, and S. Van Bastelaere, “Evaluating a computerized maintenance management system in a low resource setting,” Health Technol (Berl), vol. 11, no. 3, pp. 655–661, May 2021, doi: 10.1007/s12553-021-00524-y.
D. Meira, I. Lopes, and C. Pires, “Selection of computerized maintenance management systems to meet organizations’ needs using AHP,” Procedia Manuf, vol. 51, pp. 1573–1580, 2020, doi: 10.1016/j.promfg.2020.10.219.
F. Beniacoub, F. Ntwari, J.-P. Niyonkuru, M. Nyssen, and S. Van Bastelaere, “Evaluating a computerized maintenance management system in a low resource setting,” Health Technol (Berl), vol. 11, no. 3, pp. 655–661, May 2021, doi: 10.1007/s12553-021-00524-y.
J. M. Framinan, R. Leisten, and R. Ruiz García, “Guidelines for Developing Scheduling Systems,” in Manufacturing Scheduling Sys-tems, London: Springer London, 2014, pp. 353–369. doi: 10.1007/978-1-4471-6272-8_14.
J. Cooper, “Software Development Management Planning,” IEEE Transactions on Software Engineering, vol. SE-10, no. 1, pp. 22–26, Jan. 1984, doi: 10.1109/TSE.1984.5010194.
M. Faisal, E. M. Zamzami, and Sutarman, “Comparative Analysis of Inter-Centroid K-Means Performance using Euclidean Distance, Canberra Distance and Manhattan Distance,” J Phys Conf Ser, vol. 1566, no. 1, p. 012112, Jun. 2020, doi: 10.1088/1742-6596/1566/1/012112.
Md. Z. Hossain, Md. N. Akhtar, R. B. Ahmad, and M. Rahman, “A dynamic K-means clustering for data mining,” Indonesian Journal of Electrical Engineering and Computer Science, vol. 13, no. 2, p. 521, Feb. 2019, doi: 10.11591/ijeecs.v13.i2.pp521-526.
S. Aryanti, D. Mahdiana, and A. Setiadi, “Penerapan Metode K-Means Dan Apriori Untuk Pemilihan Produk Bundling,” Journal CERITA, vol. 8, no. 1, pp. 1–12, Feb. 2022, doi: 10.33050/cerita.v8i1.2126.
A. A. Amer, “On K-means clustering-based approach for DDBSs design,” J Big Data, vol. 7, no. 1, p. 31, Dec. 2020, doi: 10.1186/s40537-020-00306-9.
S. V. G. Devi and C. Nalini, “Performance Analysis of K-means clustering based Hyperbolic Tangent Instituted Classification of Au-tomated Coding Contracts,” in 2020 3rd International Conference on Intelligent Sustainable Systems (ICISS), IEEE, Dec. 2020, pp. 489–497. doi: 10.1109/ICISS49785.2020.9315994.
R. Annisa, D. Rosiyadi, and D. Riana, “Improved point center algorithm for K-Means clustering to increase software defect predic-tion,” International Journal of Advances in Intelligent Informatics, vol. 6, no. 3, p. 328, Nov. 2020, doi: 10.26555/ijain.v6i3.484.
E. Kula, E. Greuter, A. van Deursen, and G. Gousios, “Factors Affecting On-Time Delivery in Large-Scale Agile Software Develop-ment,” IEEE Transactions on Software Engineering, vol. 48, no. 9, pp. 3573–3592, Sep. 2022, doi: 10.1109/TSE.2021.3101192.
M. Á. Vega-Velázquez, A. García-Nájera, and H. Cervantes, “A survey on the Software Project Scheduling Problem,” Int J Prod Econ, vol. 202, pp. 145–161, Aug. 2018, doi: 10.1016/j.ijpe.2018.04.020.
J. L. Leal, J. P. Rodríguez, and O. A. Gallardo, “Project time: Time management method for software development projects-analytical summary,” J Phys Conf Ser, vol. 1126, p. 012030, Nov. 2018, doi: 10.1088/1742-6596/1126/1/012030.
P. Ozor, E. Nwobodo-Anyadiegwu, and C. Mbohwa, “COMPUTERISED SOFTWARE SYSTEMS IN REPLACEMENT MAINTENANCE INFORMATION MANAGEMENT: A SOUTH AFRICAN CASE STUDY,” South African Journal of Industrial En-gineering, vol. 31, no. 3, Nov. 2020, doi: 10.7166/31-3-2420.
F. Sukmana and F. Rozi, “Decision Support System On Computer Maintenance Management SystemUsing Association Rule and Fish-er Exact Test One Side P-Value,” TELKOMNIKA (Telecommunication Computing Electronics and Control), vol. 15, no. 4, p. 1841, Dec. 2017, doi: 10.12928/telkomnika.v15i4.5880.
O. E. Iluore, A. Mamudu Onose, and M. Emetere, “Development of asset management model using real-time equipment monitoring (RTEM): case study of an industrial company,” Cogent Business & Management, vol. 7, no. 1, p. 1763649, Jan. 2020, doi: 10.1080/23311975.2020.1763649.
D. Addis Nigussie and M. Avvari, “Implementation of Computerized Maintenance and Management System in Wine Factory in Ethio-pia: A Case Study,” in Operations Management - Emerging Trend in the Digital Era, IntechOpen, 2021. doi: 10.5772/intechopen.93007.
F. Sukmana* and F. Rozi, “Software Design and Development for Optimizing Quality Assurance Assessments,” International Journal of Recent Technology and Engineering (IJRTE), vol. 8, no. 3, pp. 3384–3389, Sep. 2019, doi: 10.35940/ijrte.C5029.098319.
D. T. Pham, S. S. Dimov, and C. D. Nguyen, “Selection of K in K -means clustering,” Proc Inst Mech Eng C J Mech Eng Sci, vol. 219, no. 1, pp. 103–119, Jan. 2005, doi: 10.1243/095440605X8298.